EDDC Honiton

EDDC Honiton

The project involved the installation of the bespoke MEP services within the new Blackdown House at Honiton to allow phase two of the relocation of EDDC from The Knowle, Sidmouth.

It comprised the installation of the MEP services to a new three storey office including:

• Air Conditioning throughout

• Heating to ancillary areas

• Ventilation

• Toilet Extract Ventilation

• Core Heating

• Domestic Hot & Cold Water Services

• Mains Distribution

• LV Installation

• Lighting

• External Lighting

• Data Installation

• Fire Alarm

• Access Control

The building achieved BREEAM Very Good rating.


Download this
Case Study as a PDF

Portrait   |   Landscape

News Signup

Sign up to receive our latest news