Madeley Academy, Telford

Madeley Academy, Telford

Madeley Academy was completed by the Dodd Group in 2009, and was fully designed and installed “in house” by Dodd Group.

The geothermal installation comprised of a horizontal trenched system, giving a capacity to the project of a 400 Kilowatt cooling load and a 200 Kilowatt heating load.