Emperor House

Emperor House

This fast track design and build shell and core scheme for the installation of the MEP services to a new three storey office to BREEAM Very Good standard was completed by Dodd Group's South West Projects Team and comprised:

• Air Conditioning

• Ventilation

• Toilet Extract Ventilation

• Core Heating

• Domestic Hot & Cold Water Services

• Mains Distribution • LV Installation

• Lighting

• External Lighting

• Containment for Client Fit Out Contractor

• Fire Alarm

• Access Control

• 128 kWp Photovoltaic Installation

• Full Back Up 330kVA Generator Installation


Download this
Case Study as a PDF

Portrait   |   Landscape

News Signup

Sign up to receive our latest news